Institutional-Repository, University of Moratuwa.  

Cost overrun factors in pre-contract and post-contract stages: A critical analysis.

Files in this item

This item appears in the following Collection(s)

  • WCS - 2022 [76]
    Proceedings of The 10th World Construction Symposium 2022