Institutional-Repository, University of Moratuwa.  

Causes generating contractual claims in national road development projects in Sri Lanka

Show simple item record

dc.contributor.advisor Fernando, Dr. NG
dc.contributor.author Diyagama, DMRS
dc.date.accessioned 2015-02-07T23:17:06Z
dc.date.available 2015-02-07T23:17:06Z
dc.date.issued 2015-02-08
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/10667
dc.description.abstract Road sector is an important element in the economy of any nation due to its impact on the welfare of the citizens and investments involved. Developing countries such as Sri Lanka invest billions worth of national resources to develop infrastructure within the country. It is essential to investigate whether these significant investments achieve the necessary value for money. A better project management is essential in order to achieve the value for money. A better management project is essential to complete the project within the expected project period and thereby the country and the society can enjoy economic benefits. Extra claims are generated by mainly the Contractor and sometimes by the client in many development projects. Extra time and efforts are spent to evaluate claims and avoid disputes. At the end of each project, considerable numbers of claims are referred to the local arbitration while some cases are referred to the very costly international arbitration mechanisms. Accordingly, this study was conducted to explore causes of generating contractual claims in national road development projects in Sri Lanka. Research required to identify and to focus on people; especially the vital facts of people, their beliefs, opinions, attitudes about contractual claims arose in projects. Accordingly, survey research was selected as the most suitable research approach for the study. Data were collected through questionnaires, semi structured interviews and observations as well as through scholarly works. Data gathered by structured interviews were analyzed using content analysis and data gathered by questionnaire surveys were analyzed using statistical data analysis technique, Mode. This study focuses on the how project’s direct stakeholders such as Engineer, Contractor, and the Employer act in the process of project development from the commencement throughout the completion. This study was limited to foreign funded national road development projects. Cluster sampling was selected as the suitable sampling method and six projects were selected as the sample for the study. The selected road projects cover all the provinces in the island except Northern Province. Projects duration commence from year 2007 to year 2010. The research identified that the most of the claims are avoidable by proper planning of the project from the design stage to the completion. Variations and additional work caused the majority of contractual claims in most projects. It was noticed that the long gap between the design stage and construction stage leads to the changes in site environment and actual site conditions, making the design different from the actual site conditions. Project usage and the Employers’ requirements change according to the time factor. Ambiguities in the Contract and Contract documents also generated a considerable number of claims. When preparing contract documents, those common errors shall be avoided by studying the problems occurred in previous projects. Employer can arrange a mechanism with higher authorities to minimize the occurrence of disputes with the revision of government tax structure. There were considerable portion of unsuccessful claims were identified in many projects. Out of these unsuccessful claims, some were properly substantiated and in the majority of unsuccessful claims, the contractor has only sent the notice or in some cases their claims were partially substantiated. Several reasons were revealed. In some cases, it is due to the frequent changing of contractor’s staff, the contractor lost the required information and details required for substantiation. This occurred due to the poor management systems of the Contractors. en_US
dc.subject BUILDING ECONOMICS-Dissertation en_US
dc.subject PROJECT MANAGEMENT-Dissertation
dc.subject PROJECTS
dc.subject ROAD DEVELOPMENTS-Sri Lanka
dc.title Causes generating contractual claims in national road development projects in Sri Lanka en_US
dc.type Thesis-Abstract en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree M.Sc. en_US
dc.identifier.department Department of Building Economics en_US
dc.date.accept 2013
dc.identifier.accno 106117 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record