Show simple item record

dc.contributor.author Dhanawardana, YLC
dc.contributor.author Siriwardana, HDPM
dc.contributor.author Henderson, SH
dc.contributor.author Kumara, HMCP
dc.contributor.author Indika, KAS
dc.contributor.author Dharmaratne, PGR
dc.contributor.author Welideniya, HS
dc.contributor.author Rohitha, LPS
dc.date.accessioned 2014-08-08T16:48:23Z
dc.date.available 2014-08-08T16:48:23Z
dc.date.issued 2014-08-08
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/10469
dc.description.abstract In fractured rock masses, large excavations have an unsupported stand-up times Jess than the minimum time required to support the roof after the excavation. Therefore, the principal objective in the design of a support system is to help the rock mass to support itself. The use of rock bolts is a very flexible supporting method that can be combined with wire mesh, shotcrete and concrete lining. During past years a wide variety of dowels and bolt types were developed but most of them failed within a short period and the cost were high. Advantages of cable strand supports have been well documented and include flexibility, strength, and ease of installation. Main objective of this project is to design rock bolts using discarded wire ropes 01' cables at a low cost. A detailed designing methodology was carried out to fabricate this bolt. The bolt consists of nearly 1.6m long cable and 16 em of anchored part and cable tightening part. Outer diameter of bolt is 33 mm and inner diameter is 12 mm and used cable diameter is Smm. Field data illustrated the amount of load measurements that the bolt can carry is 5 kN, Suggestions were made to improve the design, which will enhance bolt performance. Field tests carried out at Bogala Lanka Graphite Ltd proved that cable bolts are effective in Sri Lankan conditions. en_US
dc.language.iso en en_US
dc.subject Fractured rock, Flexibility,Support, Low cost en_US
dc.title Design and fabrication of cable bolt for excavation in a fractured rock en_US
dc.type Conference-Abstract en_US
dc.identifier.faculty Engineering en_US
dc.identifier.department Department of Earth Resources Engineering en_US
dc.identifier.year 2009 en_US
dc.identifier.conference ERE 2009 en_US
dc.identifier.place Moratuwa en_US
dc.identifier.pgnos pp. 45-48 en_US
dc.identifier.proceeding 4th Annual Conference on Mining for Sustainable Development en_US
dc.identifier.email dharme27@yahoo.com en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record