Results Per Page:

Filter by: Subject

boiler waste heat recovery (1)
capital cost estimation (1)
condensate water preheating (1)
continuous blowdown (1)
energy extraction per unit capital cost (1)
mathematical modelling (1)
sensitivity analysis. (1)
thermodynamic analysis (1)
vapour absorption chiller (1)